Team 4 working on their collapsible sleeping tunnel made of inflatable pool floats. The rings are made from a found plastic barrel.


Team 2 spent most of the class period in the wood shop working on the wooden base of their shelter. They also wrapped these pieces of wood in a waterproof tarp to see how it would work as a base.
Team 3 created two triangular side panels out of a vinyl tarp and cut mosquito netting for the windows.
The students have one week left to complete their shelters.
No comments:
Post a Comment